Packers completed installing 360 square metres of glass on levels 1 and 2 on the eastern facade of Westminster School. This stunning window wall uses 66 panels of the ALSPEC Hunter Evo 150mm Double Flush Glazed Framing system.
Packers worked with Sarah Constructions to build and renovate - five buildings at Westminster School. This consisted of two new buildings, the ‘Inquiry/Innovation Hub’ and ‘Food, Library/Performing Arts Centre’. Three other buildings that were renovated are the, ‘Michael Murray Centre’ and Classroom Blocks 300 & 400. Packers completed both external and internal aluminium windows and doors across all buildings.