Westminster School Adelaide

Packers completed installing 360 square metres of glass on levels 1 and 2 on the eastern facade of Westminster School. This stunning window wall uses 66 panels of the ALSPEC Hunter Evo 150mm Double Flush Glazed Framing system.

WESTMINSTER 230204 Z9 C0129 HDR Edit
Builder Sarah Constructions
Architect Brown Falconer

Packers worked with Sarah Constructions to build and renovate - five buildings at Westminster School. This consisted of two new buildings, the ‘Inquiry/Innovation Hub’ and ‘Food, Library/Performing Arts Centre’. Three other buildings that were renovated are the, ‘Michael Murray Centre’ and Classroom Blocks 300 & 400. Packers completed both external and internal aluminium windows and doors across all buildings.

WESTMINSTER 230204 Z9 C9942 HDR Edit
WESTMINSTER 230204 Z9 C0318 HDR Pano
WESTMINSTER 230204 Z9 C0294 HDR
WESTMINSTER 230204 Z9 C0129 HDR Edit
DJI 0566 HDR

Request A Quote

From receiving your free estimate through to making your selections and coordinating installation—the Packers team make the process simple.